首页> 外文会议>International mining Tech'97 symposium >The coal water pumping system with remote contact and high head big flow
【24h】

The coal water pumping system with remote contact and high head big flow

机译:远程接触高扬程大流量煤水抽水系统

获取原文

摘要

This paper introduces the pumping system for transfering the coal water in the second mining level of - 620m, after concatenating two coal water pumps at short - distance and in series with a coal water pump at long - distance in the first mining level of - 375m in Kuanzhuang Coal Mine of Datun Coal & Electricity Co.. It puts forward such measures as setting accident coal water sump, accident pipelines and pass pipeline, inspection holes in cooperation with hydraulic pressure, shortening the length of "caecum" pipeline to prevent and handle accidents of choking - up; This paper also advnaces some concrete methods such as setting pass pipeline, changing operating mode of long = distance concatenating and determining the pressure of coal water pump in the system; Finally, the problems of this system as well as their causes are discussed and some concrete measures are put forwared.
机译:本文介绍了在两个短距离的煤水泵串联并与远距离的一水煤泵在375m的一级串联后,用于输送第二采煤层-620m的煤水的抽水系统。提出了在大屯煤电公司宽庄煤矿进行设置事故煤水箱,事故管道和通过管道,配合液压的检查孔,缩短“盲肠”管道长度的预防和处理措施。窒息事故;本文还提出了具体的方法,如设置通道管道,改变长距离串联的运行模式,确定系统中水煤泵的压力;最后,讨论了该系统的问题及其原因,并提出了一些具体措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号