The authors provide insight into the planning and implementation of several significant cost saving and reliability improvements at a turn-of-the-century steel mill in Ohio. A number of target areas needing attention were identified. These included the cost of electrical energy, the cost to manufacture oxygen inhouse, and the need to accommodate future modernization projects. An option also under consideration included possible elimination of the oxygen facility if lower-cost oxygen could be purchased from an independent vendor. Preliminary evaluations, plans, and reviews took approximately two years before approval was received to proceed with the main oxygen plant project. Its bidding process and implementation took an additional year. The power system modernization project, which included addition of the power monitoring system, short-circuit retrofit of the 13.8 kV switchgear, distribution transformer isolation capability and two new double-ended low voltage substations took an additional six months.
机译:作者深入了解了俄亥俄州一个世纪之交的钢铁厂在几个重要的成本节省和可靠性改进方面的计划和实施情况。确定了许多需要注意的目标领域。其中包括电能成本,内部制造氧气的成本以及适应未来现代化项目的需求。如果可以从独立的供应商那里购买低成本的氧气,则还正在考虑的一种选择包括可能取消氧气设备。初步评估,计划和审查花费了大约两年时间,才获得主要氧气厂项目的批准。它的招标过程和实施又花了一年时间。电力系统现代化项目包括增加电力监控系统,对13.8 kV开关设备进行短路改造,配电变压器隔离能力以及两个新的双端低压变电站,这些工程又花费了六个月的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号