首页> 外文会议>Instrumentation in Aerospace Simulation Facilities, 1989. ICIASF '89 Record., International Congress on >Status of the development programme for instrumentation and test techniques of the European Transonic Wind Tunnel-ETW
【24h】

Status of the development programme for instrumentation and test techniques of the European Transonic Wind Tunnel-ETW

机译:欧洲跨音速风洞-ETW的仪器和测试技术开发计划的现状

获取原文

摘要

Feasibility studies concerned with instrumentation and test techniques for the European Transonic Wind Tunnel (ETW) are summarized. During the functional design phase of the ETW (1986-8), instrumentation and test techniques for application in cryogenic wind-tunnel operation were investigated during several feasibility studies. The studies were focused on items which might influence the design of the test section area (flow field observation, surface flow visualization, model attitude, and deformation measurement) and which might improve the test capability of the facility (engine simulation, model handling, and balance calibration). It is noted that precise knowledge of model loads, model position, model configuration, and the surrounding flow conditions is essential for testing Reynolds number effects. The standard equipment of wind tunnels (strain gauge balances, light sources, cameras, windows, etc.) is being investigated. The special operating conditions (cryogenic temperatures, limited access) require very special arrangements with innovative design and creative ideas even for these standard items.
机译:总结了与欧洲跨音速风洞(ETW)的仪器和测试技术有关的可行性研究。在ETW(1986-8)的功能设计阶段中,在一些可行性研究中对用于低温风洞操作的仪器和测试技术进行了研究。这些研究集中在可能影响测试截面区域设计(流场观察,表面流可视化,模型姿态和变形测量)并且可能提高设施的测试能力(发动机仿真,模型处理和变形)的项目上。天平校准)。注意,对模型载荷,模型位置,模型配置和周围流动条件的精确了解对于测试雷诺数效应至关重要。正在研究风洞的标准设备(应变计天平,光源,摄像机,窗户等)。特殊的操作条件(低温,有限的访问权限)要求非常特殊的安排,即使对于这些标准项目,也要具有创新的设计和创意。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号