DRILLING AND BLASTING OPEN CUTS IN THE UPPER EAST OF MANHATTAN—PART OF THE 86TH STREET STATION FOR THE 2ND AVENUE SUBWAY LINE

机译:曼哈顿东部东部的钻孔和爆破切割—地铁二号线86街站的一部分

获取原文

摘要

As part of the ongoing 2nd Avenue Subway program, which will relieve major congestionfor subway riders on Manhattan’s east side, MTA Capital Construction (MTA CC)contracted Skanska/Traylor Joint Venture (STJV) to excavate and concrete line the stationcavern for the 86th St Station. Before excavation of the cavern could begin, STJVhad to drill and blast a 36' wide × 190' long open cut on the south end of the station 70'below street level which would provide the access for the cavern portal. The excavationstarted east of 2nd Avenue next to a high rise apartment building and finished west of2nd avenue underneath the basement of a building STJV demolished and adjacent totwo historic/fragile brownstone buildings. To complicate matters, the excavation wentbelow 2nd Avenue, under live vehicular and pedestrian traffic plus a myriad of utilitiesincluding gas, water, sewer, electrical and communication lines.This paper will describe the means and methods employed to balance expediteddrill, excavation and rock support production with minimal impact to the community andsurrounding buildings. The obstacles that were overcome include the stringent vibrationcriteria, continuous public observation, low headroom when working with utilities,very tight surface staging, controlling environmental impacts (noise, dust, air overpressure)and safety challenges when working in one of the most densely populated andinfluential areas of Manhattan, the Upper East Side.
机译:作为正在进行的第二大道地铁计划的一部分,该计划将缓解严重的交通拥堵 适用于曼哈顿东区的地铁乘客,MTA基本建设(MTA CC) 与Skanska / Traylor合资公司(STJV)签订合同,对车站进行开挖和混凝土铺设 第86街车站的洞穴。在开始挖掘洞穴之前,STJV 必须在电台70'的南端钻一个36'宽×190'长的露天炸药并炸开 在街道以下,这将为洞穴门户提供访问权限。开挖 在第二大道以东开始,旁边是一栋高层公寓楼,在西面完成 地下STJV地下建筑的第二条大道,被拆除并与之相邻 两座历史悠久/脆弱的褐砂石建筑。使事情复杂化的是,发掘去了 在第二大道下,有实时的车辆和行人通行,加上无数的公用事业 包括煤气,水,下水道,电力和通讯线路。 本文将描述用于平衡加急的手段和方法 钻探,开挖和岩石支持生产,对社区和社区的影响最小 周围的建筑物。克服的障碍包括严格的振动 准则,持续的公众观察,与公用事业部门合作时的净空低 非常紧密的表面处理,可控制环境影响(噪音,灰尘,空气超压) 在人口最稠密, 曼哈顿上东区有影响力的地区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号