首页> 外文会议>International symposium on geotechnical aspects of underground construction in soft ground >Greater Metro Line 3, Cairo: Installation of underground construction pits using cut-off-wall and soft-gel-grouting
【24h】

Greater Metro Line 3, Cairo: Installation of underground construction pits using cut-off-wall and soft-gel-grouting

机译:开罗大地铁3号线:使用隔断墙和软凝胶灌浆安装地下施工坑

获取原文

摘要

The publication will give an overview on the preparation and execution of applied specialfoundation methods and a detailed description regarding installed soft-gel-plugs at the Greater CairoMetro Line 3. Detailed description will explain general assumptions during tendering and design ofgrout-plugs, preparation of equipment, grouting procedure during execution and quality assurance activities(checking of drilling inclination, reporting of grouting) as well as reached final results.
机译:该出版物将概述有关应用特殊技术的准备和执行 大开罗已安装的软凝胶塞的基础方法和详细说明 地铁3号线。详细描述将解释招标和设计过程中的一般假设。 灌浆塞,设备准备,执行过程中的灌浆程序以及质量保证活动 (检查钻孔倾斜度,报告灌浆)以及最终结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号