Optimization of the use and Exploitation of the Water Resource of the Catchments of the 'Hydroelectric Power Plant Ing. Carlos Mora Carrion' located in the Canton of Zamora

机译:萨莫拉州“卡洛斯·莫拉·卡里翁”水力发电厂的集水区水资源的利用和开发的优化

获取原文

摘要

The Ing. Carlos Mora Carrion Hydroelectric Plant is part of the group of Ecuadorian power plants that contribute to the energy transition planned with a view to decarbonization, whose availability of water resources exceeds current generation, wasting the flow for nine months, therefore, it is determined a problem caused by lack of infrastructure which makes it impossible to take advantage of all the water resources for the generation of electricity, this directly affects the growing population of the canton Zamora, because hydroelectric generation can be better used since it is even cheaper than thermal generation. This research presents a solution for the effective use of the Power Plant under analysis and in this way contribute to increasing production levels and prolonging the useful life of the Power Plant contributing to the current national plan of Ecuador.
机译:英格卡洛斯·莫拉·腐尸水力发电厂是厄瓜多尔发电厂集团的一部分,该电厂为实现脱碳而计划进行的能源转型做出了贡献,其可用水资源超过了目前的发电量,浪费了9个月的水流,因此,确定存在问题由于缺乏基础设施导致无法利用所有水资源来发电,这直接影响了萨莫拉州不断增长的人口,因为可以更好地利用水力发电,因为它比火力发电便宜。这项研究提出了一种有效利用分析中的发电厂的解决方案,并以此方式有助于提高生产水平和延长发电厂的使用寿命,从而为厄瓜多尔的当前国家计划做出了贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号