首页> 外文会议>Asia Conference on Power and Electrical Engineering >Feasibility Study of Renewable Energy System for an Island in Terengganu
【24h】

Feasibility Study of Renewable Energy System for an Island in Terengganu

机译:特伦甘乌岛再生能源系统的可行性研究

获取原文
获取外文期刊封面目录资料

摘要

Malaysia has started encouraging renewable energy technology in 7th Malaysia Plan.However,inadequate power distribution in the island makes diesel generator important power sources which cause pollution.Some initiatives have been made by installing wind turbine and solar panel to reduce the dependency on generator.The hybrid PV/wind system is a good combination as solar radiation is high during the Southeast Monsoon,and strong wind during the Northeast Monsoon.Since the wind speed and wave height has a strong tie,during windy season,the wave height can go up to two meters.However,the feasibility of wave energy as power supply hasn’t been explored.This paper focuses on the feasibility of using wave energy system to supply electricity to an island using HOMER.The obtained results show that a hybrid wave energy system has lower potential with cost of electricity(COE)is RM 1.303/kWh compared to the most optimal system,hybrid PV-battery generator,with COE is RM1.262/kWh.
机译:马来西亚开始在马来西亚第7次鼓舞的可再生能源技术。然而,岛上的电力分布不足,使柴油发电机重要的电源导致污染。通过安装风力涡轮机和太阳能电池板来减少对发电机的依赖性制造了一些举措。 Hybrid PV / Wind System是一个良好的组合,因为太阳辐射在东南季风期间很高,而且在东北季风期间强风。风速和波浪高度有强大的领带,在刮风季节,波浪高度可以升起但是,尚未探讨波能作为电源的波动能力的可行性。本文侧重于使用波能系统向岛屿供电的可行性。获得的结果表明,混合波能源系统有与最佳系统混合电池混合电池发生器相比,电力成本(COE)的较低潜力为RM 1.303 /千瓦时,COE为RM1.262 /千瓦时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号