首页> 外文会议>International Congress and Exposition on Noise Control Engineering >Insertion loss of vibration mitigation systems - methods of free field measurements with soil correction
【24h】

Insertion loss of vibration mitigation systems - methods of free field measurements with soil correction

机译:振动缓解系统的插入损耗 - 土壤校正的自由场测量方法

获取原文
获取外文期刊封面目录资料

摘要

The insertion loss describes the effectiveness of a vibration mitigation system as e.g. mass-spring systems, ballast mats or under sleeper pads. Measurements in free field can be done either as right/left or before/after method. In both cases two different situations are compared with the aim to get most comparable values for the vibration improvement at the relevant measuring points. Different soil conditions, geometric differences of compared sections, train variation and many other variations often make the comparison difficult, even nearly impossible. The different boundary conditions become more noticeable for smaller mitigation effects (e.g. under sleeper pads) than for high effective systems like mass-spring systems. A fundamental improvement of the results is obtained by taking into account the correct soil mobility at both measuring sections and the correct emission spectrum of the vibration source. The authors show insertion loss evaluations with and without soil correction for different mitigation systems. For soil correction the neighbored track or artificial excitation (impacts or shaker) can be used. Experiences of the presented method, advantages and disadvantages are shown with the help of practical examples. The shown methods will also be part of the new DIN45673-3-Spec "Experimental evaluation of insertion loss of mounted track systems".
机译:插入损耗描述了振动缓解系统的有效性,如例如。群众弹簧系统,镇流器垫或卧铺垫下。自由场中的测量可以作为右/左/左/ /以前/在方法之前完成。在这两种情况下,将两个不同的情况进行比较,旨在获得相关测量点的振动改善的最可比值。不同的土壤条件,比较部分的几何差异,列车变异和许多其他变化通常会使比较困难,甚至几乎不可能。对于较小的缓解效果(例如,卧铺垫下方)比高效系统更加明显,不同的边界条件比为麦满弹簧系统等高效系统变得更加明显。通过考虑到测量部分的正确土壤流动和振动源的正确发射光谱来获得结果的基本改善。作者展示了不同减缓系统的土壤校正的插入损耗评估。对于土壤校正,可以使用邻近的轨道或人造励磁(冲击或振动筛)。在实际示例的帮助下,示出了呈现的方法,优点和缺点的经验。所示的方法也将是新的DIN45673-3-SPEN的一部分“安装轨道系统的插入损耗的实验评估”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号