首页> 外文会议>Annual Water Environment Federation technical exhibition and conference >Findings from a Capital Expenditure Analysis Timing Evaluation Performed for the Fairfax County NCPCP
【24h】

Findings from a Capital Expenditure Analysis Timing Evaluation Performed for the Fairfax County NCPCP

机译:对费尔法克斯县NCPCP进行的资本支出分析时间评估的发现

获取原文

摘要

A capital investment financial analysis tool was developed to evaluate the impact of implementing different primary, secondary, and tertiary treatment capital investments and phasing under different future condition scenarios. This financial analysis tool takes a holistic, whole plant (liquids) approach to evaluate and quantify the anticipated costs of improvement scenarios based on anticipated increases in nutrient loading. This analysis was used to determine the optimal timing and type of infrastructure investments related to the NCPCP primary/secondary and related tertiary processes.
机译:开发了一种资本投资财务分析工具,以评估实施不同的一级,二级和三级处理资本投资以及在不同的未来情况下分期进行的影响。该财务分析工具采用整体的全厂(液体)方法,根据营养物的预期增加量来评估和量化改善方案的预期成本。该分析用于确定与NCPCP一级/二级和相关三级流程相关的基础设施投资的最佳时机和类型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号