Design and Construction of Post-Tensioned Straddle Bents for US 301 over SR 1, New Castle County, Delaware

机译:美国特拉华州新城堡县SR 1上US 301的后张紧式跨式床的设计与施工

获取原文

摘要

Section 1 of DelDOT's US 301 project in New Castle County, Delaware, includes the final design of 5.5 miles of limited-access toll highway. The structural design includes eleven new highway bridges, one bridge widening, eight major culverts, three retaining walls, and seven sign structures. One of the most complex design elements of the project is the interchange of the new US 301 with existing SR-1 and US 13. The flyover bridge carrying northbound US 301 over SR-1 includes two precast, post-tensioned concrete straddle bents (the first of their kind in the State of Delaware) with a maximum span length of 106 feet and total weight of 750 tons. The straddle bents were constructed and partially post-tensioned while supported on falsework within the median of SR-1 and subsequently transported, lifted, and erected into their final positions. A second stage of post-tensioning was performed after erection to provide the ultimate strength of the bents and to support the anticipated superstructure loads. Due to the caps' concrete volume, a mass concrete provision was introduced along with a thermal control plan to constrain the core temperature due to hydration and to prevent the formation of potential cracks. The theory of the straddle bent cap beam design and its structural analysis during casting, construction staging, transporting, and erection are examined.
机译:DelDOT在特拉华州新城堡县的US 301项目的第1部分包括5.5英里有限通行费高速公路的最终设计。结构设计包括11座新的公路桥梁,1座桥梁加宽,8个主要涵洞,3块挡土墙和7个标志结构。该项目最复杂的设计元素之一是将新的US 301与现有的SR-1和US 13互换。在SR-1上北侧承载US 301的立交桥包括两个预制的,后张预应力的混凝土跨弯(在特拉华州首创),最大跨度为106英尺,总重量为750吨。在SR-1的正中间支撑跨架弯时,对跨骑弯进行了构造和部分后张,然后将其运输,提升并竖立到其最终位置。架设后进行第二阶段的后张拉,以提供弯曲的极限强度并支撑预期的上部结构载荷。由于瓶盖的混凝土体积,引入了大体积混凝土以及热控制计划,以限制由于水合作用而导致的核心温度并防止潜在裂缝的形成。考察了跨式弯帽梁设计的原理及其在铸造,施工阶段,运输和安装过程中的结构分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号