首页> 外文会议>International Renewable Energy Congress >Comparison of Perturb Observe and Hill Climbing MPPT Schemes for PV Plant Under Cloud Cover and Varying Load
【24h】

Comparison of Perturb Observe and Hill Climbing MPPT Schemes for PV Plant Under Cloud Cover and Varying Load

机译:云量变化负荷下光伏电站摄动与观测及爬山MPPT方案比较。

获取原文

摘要

This paper entails the performance comparison of the Perturb and Observe (P&O) as well as the Hill Climbing (HC) maximum power point tracking (MPPT) techniques for photovoltaic (PV) systems. The system is simulated in MATLAB/Simulink under fast and slow cloud cover variation and distinct loading conditions. It has been found that the HC MPPT scheme performs better than the P&O scheme under slow and fast variation of cloud cover. Under fast cloud cover, the HC scheme can track up to 97.9% of the maximum PV module output power, while the P&O can track up to 85.31% of the maximum PV module output power. Moreover, the HC MPPT scheme tracks more PV module output power when operating under distinct loading conditions and enables for more active power to be delivered to the load, when compared to the P&O MPPT scheme.
机译:本文需要对光电系统(PV)的摄动和观测(P&O)以及爬山(HC)最大功率点跟踪(MPPT)技术进行性能比较。该系统是在MATLAB / Simulink中在快速和缓慢的云量变化以及不同的负载条件下进行仿真的。已经发现,HC MPPT方案在云覆盖的缓慢和快速变化下比P&O方案表现更好。在快速的云覆盖下,HC方案可以跟踪高达PV模块最大输出功率的97.9%,而P&O可以跟踪高达PV模块最大输出功率的85.31%。此外,与P&O MPPT方案相比,HC MPPT方案在不同的负载条件下运行时跟踪更多的PV模块输出功率,并允许将更多的有功功率传递给负载。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号