首页> 外文会议>Annual safety in ammonia plants and related facilities symposium >The Successful Debottlenecking of the OCI Beaumont Complex
【24h】

The Successful Debottlenecking of the OCI Beaumont Complex

机译:OCI博蒙特综合体的成功消除瓶颈

获取原文

摘要

The OCI Beaumont facility is an integrated methanol and ammonia complex that was built in the late 1960's and revamped in the 1980's with Lurgi's parallel steam raising methanol converters. In 2012, the OCI Beaumont facility was restarted after being moth-balled in 2004. On restart, the plant exceeded design rates and energy consumption for the case without CO2 addition. In 2015, a debottle-neck project was successfully implemented to increase methanol and ammonia production by 25% and 12% respectively. This paper discusses the safety measures taken during shutdown to preserve methanol synthesis catalyst while performing upgrade works in the high-pressure synthesis loop; and the successful restart and recovery from a start-up incident that posed great risk to Clariant's high performing MegaMax® methanol synthesis catalyst, already close to 3 years on-stream. Also discussed are the upgrades made to the facility to increase capacity while considering optimum operating conditions for extended catalyst life.
机译:OCI Beaumont工厂是由甲醇和氨组成的综合设施,建于1960年代后期,并于1980年代通过Lurgi的平行蒸汽提升甲醇转化器进行了改造。 2012年,OCI Beaumont工厂在2004年被捕捞后重新启动。重新启动后,该工厂超出了不添加CO2的情况的设计速度和能耗。 2015年,成功实施了一个脱瓶颈项目,将甲醇和氨的产量分别提高了25%和12%。本文讨论了在高压合成回路中进行升级工程时,在停机期间为保护甲醇合成催化剂而采取的安全措施。以及成功启动和从启动事件中恢复后,对科莱恩的高性能MegaMax®甲醇合成催化剂(已投入运行近3年)构成了巨大风险。还讨论了对设备进行的升级,以增加容量,同时考虑了延长催化剂寿命的最佳操作条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号