首页> 外文会议>AACE International conference expo >Novel Single-side Suspension Footbridge: BIM, IPD and Cost Control Case Study
【24h】

Novel Single-side Suspension Footbridge: BIM, IPD and Cost Control Case Study

机译:新型单面悬挂人行天桥:BIM,IPD和成本控制案例研究

获取原文

摘要

Wishing Star Lake Park is located beside the Shanghai Disney Resort and contains two distinctive footbridges constructed across the river. Both structures are concrete, steel and cable suspension with unique curved space beams, double decks and single-side suspension. Two bridges contain both creative aesthetic design features and also a cleverly-created load path. The unique bridge features required different techniques in component fabrication, structural analysis and construction technology, compared with the conventional suspension bridges. There were unexpected risks in progress, performance and safety during the construction, which had an effect on the project cost control. The unique design also created new challenges for cost control, which is in contrast to the typical suspension bridge design. This paper reports the novel features that encompasses the architecture and structural design, cable system and construction methods. The paper outlines the successful application of Building Information Modeling(BIM) technology. It also discusses the cost control process by use of subdividing the novel project segments, project work flow arrangement, construction processing selecting and component selecting, andfabrication. As a case study, this paper highlights the Integrated Project Delivery (IPD), including the team organization andworking methods. Based on the IPD input, the reasonable technologies, methods and products of construction are selected, which is the key to the cost control in this novel project.
机译:许愿星湖公园位于上海迪士尼度假区旁边,内有两条横跨河道的独特行人天桥。两种结构均为混凝土,钢和电缆悬挂,具有独特的弯曲空间梁,双层甲板和单侧悬挂。两座桥既包含创造性的美学设计特征,又包含巧妙创建的荷载路径。与传统的悬索桥相比,独特的桥梁功能在零件制造,结构分析和施工技术上需要不同的技术。施工过程中存在意料之外的进度,性能和安全风险,影响了项目成本控制。与典型的吊桥设计相比,独特的设计还为成本控制带来了新的挑战。本文报告了新颖的功能,包括建筑和结构设计,电缆系统和构造方法。本文概述了建筑信息模型(BIM)技术的成功应用。它还通过细分新颖的项目部分,项目工作流程安排,施工过程选择和组件选择以及制造来讨论成本控制过程。作为案例研究,本文重点介绍了集成项目交付(IPD),包括团队组织和工作方法。根据IPD的投入,选择合理的施工技术,方法和产品,这是该新颖项目成本控制的关键。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号