首页> 外文会议>International conference on nuclear engineering >RESEARCH ON THE INSPECTION STRATEGY CHANGE BASED ON RISK-INFORMED METHOD IN NUCLEAR POWER PLANT
【24h】

RESEARCH ON THE INSPECTION STRATEGY CHANGE BASED ON RISK-INFORMED METHOD IN NUCLEAR POWER PLANT

机译:基于风险信息法的核电站检验策略变化研究

获取原文

摘要

In order to gain more operational benefits, many nuclear power plants will intend to optimize the generation activity to increase generating capability factor, such as, shortening the refueling schedule by optimize the inspection strategy of relevant to SSCs(structure, system, component) during reactor shutdown. Therefore, this paper will introduce the research on the inspection strategy change based on risk-informed method, and provide detailed discussion on change of the RHR heat exchanger inspection strategy by employed the above mentioned method in one nuclear power plant. The result shows that the optimization of RHR heat exchanger inspection strategy meets all the consideration of the principles in risk-informed decision-making required by RG 1.174 and the optimization proposal is acceptable.
机译:为了获得更多的运行效益,许多核电厂将计划优化发电活动以增加发电能力因子,例如,通过优化反应堆期间与超临界流体(结构,系统,组件)相关的检查策略来缩短加油时间关掉。因此,本文将介绍基于风险告知法的检查策略变更研究,并详细讨论在一个核电站中采用上述方法对RHR换热器检查策略进行变更的方法。结果表明,RHR换热器检查策略的优化满足RG 1.174要求的风险告知决策原则的所有考虑,并且该优化建议是可以接受的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号