首页> 外文会议>International Multi-Topic Conference >Minimization of Power Losses on Selected 132kv Overhead Transmission Line in Hazara Division Pakistan to Improve the System Efficiency
【24h】

Minimization of Power Losses on Selected 132kv Overhead Transmission Line in Hazara Division Pakistan to Improve the System Efficiency

机译:在Hazara Divion Pakistan中选择132kV架空输电线路功率损失的最小化,提高了系统效率

获取原文

摘要

Increasing demand of electrical energy due to huge power usage and industrialization. It's generating locations small amount of energy are utilized while remaining electrical energy are transmitted through long cables or conductor to the demand area. This transmission is possible by overhead power lines, which are affected by various technical and non- technical losses. Calculation of these losses are important for several reason. The real time data can be taken of the proposed selected overhead lines using Load Flow analysis (LFA), to find the power losses of the existing system. LFA result show that losses can be minimized by changing the existing conductor of the system as well as by adding new generating plants. The said research presents analysis of power losses of 132kv selected line in hazara division and suggest remedial measure to improve efficiency of the system to minimize the losses.
机译:由于巨大的电力使用和工业化,越来越多的电能需求。它的产生位置利用少量能量,同时剩余电能通过长电缆或导体传输到需求区域。通过架空电力线可以通过各种技术和非技术损失影响该传输。这些损失的计算对于几个原因很重要。可以使用负载流量分析(LFA)来拍摄建议所选架空线的实时数据,以找到现有系统的功率损耗。 LFA结果表明,通过改变系统的现有导体以及添加新的发电厂,可以最小化损耗。该研究提出了哈萨拉师132kV选定线的功率损失分析,并提出了提高系统效率的补救措施,以最大限度地减少损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号