首页> 外文会议>COTA international conference of transportation professionals >Congestion Charging on New Road Incorporating Induced Traffic in China
【24h】

Congestion Charging on New Road Incorporating Induced Traffic in China

机译:结合中国诱导交通的新道路拥堵收费

获取原文

摘要

Road construction and congestion charging are popular methods for alleviating traffic congestion. New road construction aims at meeting with people's travel demands. Congestion charging is a necessary way to configure reasonably basic infrastructure. In order to test the usefulness of congestion charging on new roads, four compared experiments are built on the basis of different cases of road construction and congestion charging. Based on stated preference data collection and four compared experiments simulated with VISSIM software, the congestion condition and social benefits confirm that new roads in the congestion area could not solve traffic congestion problem of incorporating induced traffic. Results show that congestion charging incorporated into new road construction is the efficient way to alleviate road congestion incorporating induced traffic and satisfy people's travel demands. Therefore, congestion charging on new roads should be a good solution from both a demand and supply view to solve traffic congestion problems.
机译:道路建设和交通拥堵收费是缓解交通拥堵的流行方法。新的道路建设旨在满足人们的出行需求。拥塞计费是配置合理的基础架构的必要方法。为了测试拥堵收费在新道路上的有用性,根据道路建设和拥堵收费的不同情况,进行了四个比较实验。基于陈述的偏好数据收集和使用VISSIM软件进行的四个比较实验,拥挤状况和社会效益证实,拥挤区域的新道路无法解决引入诱导交通的交通拥挤问题。结果表明,将拥堵收费纳入新的道路建设中是缓解包含交通诱导的道路拥堵并满足人们出行需求的有效方法。因此,从需求和供给的角度来看,新道路上的交通拥堵收费应该是解决交通拥堵问题的良好解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号