首页> 外文会议>Working Conference on Mining Software Repositories >Built to Last or Built Too Fast? Evaluating Prediction Models for Build Times
【24h】

Built to Last or Built Too Fast? Evaluating Prediction Models for Build Times

机译:建立到最后还是建立得太快?评估构建时间的预测模型

获取原文

摘要

Automated builds are integral to the Continuous Integration (CI) software development practice. In CI, developers are encouraged to integrate early and often. However, long build times can be an issue when integrations are frequent. This research focuses on finding a balance between integrating often and keeping developers productive. We propose and analyze models that can predict the build time of a job. Such models can help developers to better manage their time and tasks. Also, project managers can explore different factors to determine the best setup for a build job that will keep the build wait time to an acceptable level. Software organizations transitioning to CI practices can use the predictive models to anticipate build times before CI is implemented. The research community can modify our predictive models to further understand the factors and relationships affecting build times.
机译:自动化构建是持续集成(CI)软件开发实践必不可少的部分。在CI中,鼓励开发人员尽早并经常进行集成。但是,在频繁进行集成时,较长的构建时间可能会成为一个问题。这项研究的重点是在经常集成和保持开发人员生产力之间找到平衡。我们提出并分析可以预测工作建立时间的模型。这样的模型可以帮助开发人员更好地管理他们的时间和任务。此外,项目经理可以探索不同的因素来确定构建作业的最佳设置,从而将构建等待时间保持在可接受的水平。过渡到CI实践的软件组织可以使用预测模型来预测实施CI之前的构建时间。研究社区可以修改我们的预测模型,以进一步了解影响构建时间的因素和关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号