首页> 外文会议>International topical meeting on nuclear plant instrumentation, control, and human-machine interface technologies >The Overview in Safety Review of Human Factors Engineering and Control Room Design in Chinese Ap1000 Nuclear Power Plant
【24h】

The Overview in Safety Review of Human Factors Engineering and Control Room Design in Chinese Ap1000 Nuclear Power Plant

机译:中国Ap1000核电厂人为工程和控制室设计安全审查概述。

获取原文

摘要

The first AP1000 nuclear power plant is constructed in Sanmen county in Zhejiang Province in China, which has creative and distinctive design characteristics. Human factors engineering disciplines are applied to the design of the AP1000. In addition to the elements of the program review model(including human factors engineering program management, operating experience review, functional requirements analysis and allocation, task analysis, staffing, integration of human reliability analysis with human factors engineering, human system interface design, procedure development, training program development, human system interface verification and validation, design implementation, human performance monitoring),the minimum inventory of controls, displays, and alarms present in the main control room and at the remote shutdown workstation. These contents mentioned above are reviewed according to standards, rules and regulations. This article introduces review process, and several important issues during the reviewing are described in detail. These issues include many elements, such as operating experience review, task analysis, human system interface design, verification and validation ,and so on. This paper emphasizes on the main control room designfincluding environment and layout). Background noise in the actual main control room may exceed too much to design value. Another important issue is about main control room habitability systems(VES) changes to satisfy post-actuation performance requirements in AP1000 design change proposal. All the wall panel displays will be closed in this design change proposal. Review process and proposal are described in the paper. Since the AP1000 unit in China is the first constructed all over the world, verification and validation are especially important and necessary. The plan of verification and validation, the results summary report of verification and validation, the report of human engineering discrepancies are focus attention. Verification and validation in human factors engineering include HSI task support verification, HFE design verification and integrated system validation. This paper introduces the review process of verification and validation, the issues found in verification and validation.
机译:首座AP1000核电站在中国浙江省三门县建成,具有创新性和鲜明的设计特色。人为因素工程学科被应用到AP1000的设计中。除程序审查模型的要素(包括人为因素工程计划管理,操作经验审查,功能需求分析和分配,任务分析,人员配备,人为可靠性分析与人为因素工程的集成,人机界面设计,程序开发外) ,培训程序开发,人机界面验证和确认,设计实施,人机性能监控),主控制室和远程关机工作站中存在的控件,显示和警报的最低清单。上面提到的这些内容均根据标准,规则和法规进行了审查。本文介绍了审阅过程,并详细描述了审阅过程中的几个重要问题。这些问题包括许多要素,例如操作经验审查,任务分析,人机界面设计,验证和确认等。本文重点介绍了主控室的设计(包括环境和布局)。实际主控制室中的背景噪声可能会超出设计值。另一个重要问题是关于主控室居住系统(VES)的更改,以满足AP1000设计更改建议中的启动后性能要求。在此设计更改建议中,所有壁板显示器都将关闭。本文描述了审核过程和建议。由于中国的AP1000装置是世界上第一个建造的装置,因此验证和确认就显得尤为重要和必要。验证和确认计划,验证和确认结果摘要报告,人为工程差异报告是关注的焦点。人为因素工程中的验证和确认包括HSI任务支持验证,HFE设计验证和集成系统验证。本文介绍了验证和确认的审查过程,以及在验证和确认中发现的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号