首页> 外文会议>International topical meeting on nuclear plant instrumentation, control, and human-machine interface technologies >The Overview in Safety Review of Human Factors Engineering and Control Room Design in Chinese Ap1000 Nuclear Power Plant
【24h】

The Overview in Safety Review of Human Factors Engineering and Control Room Design in Chinese Ap1000 Nuclear Power Plant

机译:中国AP1000核电站人类因素工程控制室设计安全审查概述

获取原文

摘要

The first AP1000 nuclear power plant is constructed in Sanmen county in Zhejiang Province in China, which has creative and distinctive design characteristics. Human factors engineering disciplines are applied to the design of the AP1000. In addition to the elements of the program review model(including human factors engineering program management, operating experience review, functional requirements analysis and allocation, task analysis, staffing, integration of human reliability analysis with human factors engineering, human system interface design, procedure development, training program development, human system interface verification and validation, design implementation, human performance monitoring),the minimum inventory of controls, displays, and alarms present in the main control room and at the remote shutdown workstation. These contents mentioned above are reviewed according to standards, rules and regulations. This article introduces review process, and several important issues during the reviewing are described in detail. These issues include many elements, such as operating experience review, task analysis, human system interface design, verification and validation ,and so on. This paper emphasizes on the main control room designfincluding environment and layout). Background noise in the actual main control room may exceed too much to design value. Another important issue is about main control room habitability systems(VES) changes to satisfy post-actuation performance requirements in AP1000 design change proposal. All the wall panel displays will be closed in this design change proposal. Review process and proposal are described in the paper. Since the AP1000 unit in China is the first constructed all over the world, verification and validation are especially important and necessary. The plan of verification and validation, the results summary report of verification and validation, the report of human engineering discrepancies are focus attention. Verification and validation in human factors engineering include HSI task support verification, HFE design verification and integrated system validation. This paper introduces the review process of verification and validation, the issues found in verification and validation.
机译:第一个AP1000核电站在中国浙江省三门县建造,具有创造性和独特的设计特色。人类因素工程学科应用于AP1000的设计。除了程序审查模型的要素外(包括人为因素工程方案管理,运营经验审查,功能要求分析和分配,任务分析,人员配置,人类可靠性分析与人类因素工程,人体系统界面设计,程序开发,培训计划开发,人力系统界面验证和验证,设计实现,人力性能监测),主控室中存在的最低控制,显示和报警的最低库存和远程关闭工作站。上述这些内容根据标准,规则和法规进行审查。本文介绍了审核过程,详细介绍了审查期间的几个重要问题。这些问题包括许多元素,例如操作体验审查,任务分析,人类系统界面设计,验证和验证等。本文强调了主控室设计中的环境和布局)。背景技术实际主控室中的噪音可能超过设计值太多。另一个重要问题是关于主控制室的适用性系统(VES)更改,以满足AP1000设计变更提案中的致动后性能要求。在这种设计变更提案中,所有墙板显示屏都将关闭。审查流程和提案在论文中描述。由于中国的AP1000单元是世界上第一批构建的,验证和验证尤为重要,必要。核查和验证计划,结果概要报告核查和验证,人工工程差异的报告焦点关注。人为因素工程中的验证和验证包括HSI任务支持验证,HFE设计验证和集成系统验证。本文介绍了验证和验证的审查过程,验证和验证中发现的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号