首页> 外文会议>Geotechnical frontiers >Cleveland Harbor, Ohio, Interim Dredge Disposal Plan: Geotextile Reinforcement of Raised Dredged Disposal Containment Dikes
【24h】

Cleveland Harbor, Ohio, Interim Dredge Disposal Plan: Geotextile Reinforcement of Raised Dredged Disposal Containment Dikes

机译:Cleveland Harbour,俄亥俄州,临时疏浚处置计划:凸起疏浚处置箱挖掘的土工布加固

获取原文

摘要

The U.S. Army Corps of Engineers, Buffalo District, performs yearly maintenance dredging in the Cuyahoga River federal navigation channel in Cleveland, Ohio. Up to the present, the Corps has disposed of dredge material in three diked rubble mound (armor and fill stone) confined disposal facilities (CDFs) in Cleveland Harbor, Ohio. In 2003, it became evident that capacity in these facilities was rapidly being depleted. To provide more capacity, the facilities were vertically expanded with raised earth dikes: the first was CDF 12, constructed in 2008; the second was CDF 9 in 2010. This paper discusses the engineering analysis performed using geotextile reinforcement for raised CDFs and stabilization. It presents a design approach for geotextile reinforced embankments considering rotational mode of failure using GEO-SLOPE International Ltd.'s SLOPE/W software.
机译:美国军队的工程师,布法罗区,在俄亥俄州克利夫兰的Cuyahoga河联邦航海航道中进行年度维修疏浚。截至目前,该兵团已经在俄亥俄州克利夫兰港的三艘拖尾瓦砾土墩(盔甲和填充石)内狭窄的处置设施(CDFS)处置。 2003年,明显的是,这些设施的能力迅速耗尽。为了提供更多的能力,设施垂直扩展,升级地球堤防:第一个是CDF 12,于2008年建造;第二次是CDF 9 2010年。本文讨论了使用土工织物增强升高的CDF和稳定性进行的工程分析。它介绍了考虑使用Geo-Slope International Ltd.的斜率/ W软件的旋转故障模式的土工织物增强堤的设计方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号