首页> 外文会议>IEEE International conference on Control Science and Systems Engineering >Simulation and optimization of the cross-docking operation scheme of logistics center : In the case of decathlon yanjiao logistics center
【24h】

Simulation and optimization of the cross-docking operation scheme of logistics center : In the case of decathlon yanjiao logistics center

机译:物流中心跨站台运作方案的仿真与优化:以十项全能燕郊物流中心为例

获取原文

摘要

For the existing problems of Decathlon Yanjiao logistics center, based on analyzing the operating process of applicable items for cross-docking, the cross-docking operation scheme was presented for Decathlon Yanjiao logistics center. By designing the simulation scheme, the Flexsim simulation model was set up, and the optimal results were analyzed respectively under three different principles of working fastest, time-cost minimum and equipment vacancy rate-cost minimum. Finally, the comprehensive analysis was made up using the cost-to-efficiency index, and the rational scheme of 2.9 hours for working time and 17.27% for equipment vacancy rate was obtained to ten thousand pieces goods. The analysis process and result not only provide the reference for optimizing the cross-docking operating scheme, but also provide a visual method for optimization of logistics distribution scheme under different conditions.
机译:针对十项全能燕郊物流中心存在的问题,在分析交叉对接适用项目的运行过程的基础上,提出了十项全能燕郊物流中心的跨对接运作方案。通过设计仿真方案,建立了Flexsim仿真模型,并根据工作最快,时间成本最小和设备空置率成本最小的三种不同原理分别对最优结果进行了分析。最后,采用成本效益指数进行了综合分析,得出了万件商品的工作时间为2.9小时,设备空置率为17.27%的合理方案。分析过程和结果不仅为优化跨站台作业方案提供了参考,而且为不同条件下物流配送方案的优化提供了可视化的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号