Roller Coaster Highways: The Implementation and Execution of a Settlement Monitoring Program at Two Colorado Highway Projects

机译:过山车高速公路:两个科罗拉多州高速公路项目的沉降监测计划的实施和执行

获取原文

摘要

We are all familiar with the infamous "bump" at the end of a bridge. After recent highway projects experienced significant differential settlement at bridge abutments, the Colorado Department of Transportation (CDOT) updated their specifications to address the problem. CDOT now requires contractors to monitor embankment settlement and verify the completion of primary settlement prior to allowing roadway paving. Kleinfelder, as part of design-build teams, was selected to provide geotechnical services for two highway interchange projects requiring settlement monitoring, and consulted each contractor on the implementation and execution of a settlement monitoring program. Instruments were installed at the subgrade/foundation soils elevation, middle depth of the embankments, and at the final grade to determine the rate of settlement at each location within the embankment fill. Four instrument types were chosen based on subgrade soils and the installation height within the fill. Installation of the instruments required planning, cooperation, and communication with the prime contractor, sub-contractors, and CDOT representatives, to address the challenges of location selection during the fluid design-build process, avoiding and repairing damage to instruments, and field installation of the instruments. Settlement data was collected for analysis and submitted regularly throughout the construction process. Observed settlement data was compared to predicted and theoretical models. The settlement monitoring programs discussed are unique for Colorado highway projects, and presented are the challenges and lessons learned in implementing and executing settlement monitoring programs on two highway interchange projects.
机译:我们都熟悉桥梁尽头那臭名昭著的“凹凸”。在最近的高速公路项目在桥台处出现明显的差异沉降之后,科罗拉多州交通运输部(CDOT)更新了其规格以解决该问题。 CDOT现在要求承包商在允许铺路之前监视路堤沉降并验证基本沉降的完成。作为设计建造团队的一部分,克莱因费尔德被选中为需要沉降监测的两个高速公路立交项目提供岩土工程服务,并就沉降监测计划的实施和执行向每个承包商进行了咨询。将仪器安装在路基/基础土壤标高,路堤的中层深度以及最终坡度上,以确定路堤填土中每个位置的沉降速率。根据路基土壤和填充物中的安装高度选择了四种仪器类型。仪器的安装需要与总承包商,分包商和CDOT代表进行计划,合作和沟通,以解决在流体设计,建造过程中选择位置,避免和修复仪器损坏以及现场安装的挑战。仪器。收集沉降数据进行分析,并在整个施工过程中定期提交。将观测到的沉降数据与预测模型和理论模型进行了比较。讨论的沉降监测程序对于科罗拉多州的高速公路项目是独一无二的,并介绍了在两个高速公路立交项目上实施和执行沉降监测程序时所面临的挑战和经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号