Roller Coaster Highways: The Implementation and Execution of a Settlement Monitoring Program at Two Colorado Highway Projects

机译:过山车高速公路:两个科罗拉多州高速公路项目的解决监测计划的实施和执行

获取原文

摘要

We are all familiar with the infamous "bump" at the end of a bridge. After recent highway projects experienced significant differential settlement at bridge abutments, the Colorado Department of Transportation (CDOT) updated their specifications to address the problem. CDOT now requires contractors to monitor embankment settlement and verify the completion of primary settlement prior to allowing roadway paving. Kleinfelder, as part of design-build teams, was selected to provide geotechnical services for two highway interchange projects requiring settlement monitoring, and consulted each contractor on the implementation and execution of a settlement monitoring program. Instruments were installed at the subgrade/foundation soils elevation, middle depth of the embankments, and at the final grade to determine the rate of settlement at each location within the embankment fill. Four instrument types were chosen based on subgrade soils and the installation height within the fill. Installation of the instruments required planning, cooperation, and communication with the prime contractor, sub-contractors, and CDOT representatives, to address the challenges of location selection during the fluid design-build process, avoiding and repairing damage to instruments, and field installation of the instruments. Settlement data was collected for analysis and submitted regularly throughout the construction process. Observed settlement data was compared to predicted and theoretical models. The settlement monitoring programs discussed are unique for Colorado highway projects, and presented are the challenges and lessons learned in implementing and executing settlement monitoring programs on two highway interchange projects.
机译:我们都熟悉的臭名昭著的“凸点”在桥的尽头。经过近高速公路项目在桥墩经历显著不均匀沉降,运输的科罗拉多部门(CDOT)更新了他们的规范来解决这个问题。 CDOT现在要求承包商在允许道路铺路监视堤沉降和验证初级沉降的完成。 Kleinfelder,如设计 - 建造团队的一部分,被选定为需要沉降监测二级公路立交项目提供岩土工程服务,并征求其关于解决监测方案的实施和执行每个承包商。仪器被安装在路基/地基土抬高,河堤的中间深度,并在最终成绩来确定在填土内的每个位置沉降的速率。四点仪器的类型是基于路基土和填充内安装高度选择。仪器的安装所需的规划,合作,沟通与主承包商,分包商,并CDOT代表,以解决在流体设计建造过程选址的挑战,避免和修复损坏的仪器,以及现场安装该仪器。结算数据收集进行分析并在整个施工过程中定期提交。沉降观测数据进行了比较,以预测和理论模型。讨论的结算监督方案科罗拉多州公路项目独特的,并提出在实施和二级公路立交项目执行和解监测方案学到的挑战和经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号