Alberta Transportation's Experience with Cold In-place Recycling

机译:艾伯塔运输公司就地冷回收的经验

获取原文

摘要

Alberta Transportation constructed its first Cold In-place Recycling (CIR) project on Highway 761 near Rocky Mountain House in 2008. To date, the Department has used this technology on approximately 115 kilometres of roadway within nine separate paving contracts. The CIR specification used by Alberta Transportation calls for the use of a bituminous stabilizing additive and allow the Contractor to choose either an emulsified or foamed asphalt product. Of the nine projects completed to date, emulsified asphalt was used on eight and foamed asphalt on one. These projects also used a number of different contractors and CIR equipment trains. This paper discusses Alberta Transportation's project selection criteria; mix design procedures, and the quality control/quality assurance testing program. This paper also discusses the performance of the CIR projects to date, with an emphasis on the mitigation of transverse reflective cracking. Additionally, the performance of three comparator test sections, constructed in conjunction with the CIR projects, is also provided. Two of these projects included FDR comparators, while one included a Mill and Inlay comparator. Monitoring results to date show that CIR has not mitigated reflective cracking as much as originally anticipated. This paper also identifies potential changes to project design criteria and construction specifications that may improve reflective crack mitigation.
机译:艾伯塔省交通局(Alberta Transportation)于2008年在落基山庄(Rocky Mountain House)附近的761号公路上建设了第一个冷就地回收(CIR)项目。迄今为止,该部门已在9个单独的铺装合同中在约115公里的巷道上使用了该技术。艾伯塔运输公司使用的CIR规范要求使用沥青稳定添加剂,并允许承包商选择乳化或泡沫沥青产品。迄今为止已完成的九个项目中,八个使用乳化沥青,一个使用泡沫沥青。这些项目还使用了许多不同的承包商和CIR设备培训。本文讨论了阿尔伯塔运输公司的项目选择标准。混合设计程序和质量控制/质量保证测试程序。本文还讨论了迄今为止的CIR项目的性能,重点是减轻横向反射裂缝。此外,还提供了与CIR项目一起构建的三个比较器测试部分的性能。其中两个项目包括FDR比较器,而一个项目包括Mill和Inlay比较器。迄今为止的监测结果表明,CIR并没有像最初预期的那样缓解反射裂缝。本文还确定了对项目设计标准和施工规范的潜在更改,这些更改可能会改善反射裂缝的缓解程度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号