首页> 外文会议>UMN annual geotechnical engineering conference >Buckled piling at Ⅰ-43 Leo Frigo memorial bridge
【24h】

Buckled piling at Ⅰ-43 Leo Frigo memorial bridge

机译:狮子座弗里戈纪念桥Ⅰ-43处的屈曲桩

获取原文

摘要

A foundation retrofit was completed for WisDOT to reopen the Ⅰ-43 Leo Frigo Memorial Bridge, after about 61 cm of abrupt settlement at Pier 22. A multi-faceted forensic investigation was completed to evaluate mechanisms that led to section loss and subsequent buckling of existing driven HP14×73 pile foundations. Post-tensioned footing extensions were used to tie existing footings to new concrete footing extensions supported on 152 cm diameter drilled shafts, which were lined with fiberglass electrical-isolation sleeves.
机译:WisDOT在第22墩处突然沉降约61厘米后,完成了WisDOT的基础改造,以重新开放Ⅰ-43里奥·弗里戈纪念桥。进行了多方面的法证研究,以评估导致断面和随后屈曲的机制打入HP14×73桩基。后张紧的基础扩展用于将现有基础与新的混凝土基础扩展绑在一起,新的混凝土基础扩展支撑在直径为152 cm的钻孔轴上,该轴衬有玻璃纤维电绝缘套管。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号