首页> 外文会议>Annual AGIFORS symposium >Centralized Deicing Facilities During Winter Operations
【24h】

Centralized Deicing Facilities During Winter Operations

机译:冬季运营期间集中式除冰设施

获取原文

摘要

1.CDFs did not reduce taxiout times as expected. 1.1Instead, there was a notable increase in taxiout times because aircraft tend to hoid at the gate rather than queue after pushback. 1.2Analyzing time to takeoff (sch out - act off) shows the impact indicated by increased taxi out times is not as drastic, though it remains higher at CDF airports. 2.Airlines noted significantly increased taxiout times at SLC after CDF's. 2.1Comparing Delta and Southwest 737 aircraft leaving from similar gates at SLC revealed taxiout and time to takeoff increased after moving deicing operations to the CDFs. 2.2Delta experienced a similar increase while neither carrier recovered from the prior year increase.
机译:1.CDFS没有预期减少三租车时间。 1.1instead,出租车时代有一个值得注意的增加,因为飞机倾向于在浇口而不是队列之后的推送。 1.2分析到起飞时间(SCH OUT - ACT OFF)显示了增加的出租车的冲击时间没有像CDF机场仍然较高的那样急剧。 2.在CDF之后,航空公司注意到SLC的三次滑行时间。 2.1比较捷星和西南737架飞机从SLC处于类似的盖茨,揭示了对CDF的传导操作后揭示了滑行和起飞时间。 2.2Delta经历了类似的增加,而既未从头年份恢复增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号