Big Ship Ready in Tacoma-The Reconfiguration of Pier 4

机译:塔科马已准备好大船-码头4的重新配置

获取原文

摘要

As an initial step in constructing the first "big ship" ready container terminal in the Pacific Northwest, the Port of Tacoma has embarked on a series of wharf upgrade projects at Piers 3 and 4 to accommodate berthing two Ultra Large Container Vessels (ULCVs). An unusual kinked pierhead line configuration, a waterway width restriction, a 64-foot gauge crane rail system, and mooring and berthing components sized for smaller vessels required a structural upgrade of Pier 3 and a complete reconfiguration of Pier 4. The project was initiated with the upgrade of Pier 3, which was completed in late 2014. The next step involves the reconfiguration of Pier 4, which is the focus of this paper. Numerous design and environmental challenges unique to the site required the project to be separated into two phases that were designed in parallel. This paper will focus on the approach taken to upgrade Pier 4 and provides an overview of the project, design criteria, and solutions implemented.
机译:作为在太平洋西北地区建造第一个“大型船”就绪集装箱码头的第一步,塔科马港已开始在3号和4号码头进行一系列码头升级项目,以容纳两艘超大型集装箱船(ULCV)的泊位。异常弯折的码头线配置,水路宽度限制,64英尺规格的起重机导轨系统以及尺寸适合较小船只的系泊和泊泊组件需要对3号墩进行结构升级,并对4号墩进行完全重新配置。码头3的升级已于2014年底完成。下一步涉及码头4的重新配置,这是本文的重点。该地点独特的众多设计和环境挑战要求将项目分为并行设计的两个阶段。本文将重点介绍升级第4码头的方法,并概述该项目,设计标准和实施的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号