Scheduling based cost estimation model: An effective empirical approach for GSD project

机译:基于计划的成本估算模型:GSD项目的有效经验方法

获取原文

摘要

Trustworthy effort estimation for a software project remains one of the biggest challenges for developer. Software effort estimation is the initial phase between the client and the business enterprise. So the association begins with effort estimation. Trustworthiness increases accurate estimation. Organizations turned toward GSD because it benefits with shorter development cycle. This paper presents a preliminary study of the consequences of intercultural factors. GSD involves geographical, temporal and sociocultural distances which affects communication, coordination and control of development processes. This paper deals with parameters for accurate estimation using Scheduling based method and also recommends few ideas for future research.
机译:对软件项目的可信赖的工作量估计仍然是开发人员面临的最大挑战之一。软件工作量估算是客户与企业之间的初始阶段。因此,关联从工作量估算开始。可信度增加了准确的估计。组织之所以转向GSD,是因为它可以缩短开发周期,从而受益。本文对跨文化因素的后果进行了初步研究。 GSD涉及地理,时间和社会文化的距离,这影响了发展过程的沟通,协调和控制。本文使用基于调度的方法处理用于精确估计的参数,并提出了一些未来研究的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号