Scheduling based cost estimation model: An effective empirical approach for GSD project

机译:基于调度的成本估算模型:GSD项目有效的实证方法

获取原文

摘要

Trustworthy effort estimation for a software project remains one of the biggest challenges for developer. Software effort estimation is the initial phase between the client and the business enterprise. So the association begins with effort estimation. Trustworthiness increases accurate estimation. Organizations turned toward GSD because it benefits with shorter development cycle. This paper presents a preliminary study of the consequences of intercultural factors. GSD involves geographical, temporal and sociocultural distances which affects communication, coordination and control of development processes. This paper deals with parameters for accurate estimation using Scheduling based method and also recommends few ideas for future research.
机译:值得信赖的努力估算软件项目仍然是开发人员最大的挑战之一。软件努力估计是客户端和商业企业之间的初始阶段。所以该协会始于努力估计。可靠性增加了准确的估计。组织转向GSD,因为它的发展周期较短。本文提出了跨文化因素后果的初步研究。 GSD涉及地理,时间和社会文化距离,影响开发过程的通信,协调和控制。本文涉及使用基于调度的方法来准确估计的参数,并为未来的研究推荐了一些想法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号