Remedial Works to Avoid Flooding in the Biassa Tunnel Rail Connection from La Spezia to Genova

机译:避免从拉斯佩齐亚到热那亚的Biassa隧道铁路连接中发生洪灾的补救措施

获取原文

摘要

The Biassa tunnel was subject to severe flooding inside during rainy seasons and train traffic suffered unwanted stops due to submerged rails. The tunnel drainage system was poor and to solve the problem, a new water collecting system was designed by taking into consideration the total estimated amount of water for each portion of the tunnel. Building new drainage required an important excavation below the tunnel with technical problems of tunnel lining and rock stability and technological problems of cutting 1.5-1.7 m thickness of medium to hard rock at the bottom of the tunnel for an 830 m long alleyway. The new large culvert has hold under the weight of the ballast, the rails and the train's weight or that of a heavy cement mixer truck.
机译:比亚萨(Biassa)隧道在雨季遭受严重的内部洪水侵袭,由于铁轨被淹没,火车交通遭受了不必要的停顿。隧道排水系统较差,为解决该问题,设计了一种新的集水系统,其中考虑了隧道各部分的总用水量。修建新的排水系统需要在隧道下方进行重要的开挖,隧道内衬的技术问题和岩石的稳定性以及在830 m长的巷道的底部切割1.5-1.7 m厚度的中硬岩的技术问题。新的大型涵洞可以承受压载物,轨道和火车的重量,也可以承受重型水泥搅拌车的重量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号