Reliability of Plant Instrumentation, in particular, Safety Instrumented Function (SIF) at PP(T)SB {PETRONAS Penapisan (Terengganu) Sdn Bhd} , a refinery situated East Coast of West Malaysia is critical. The challenges encountered here is ability for the existing SIF instrumentation to meet the Safety Integrity Level (SIL) as calculated and reported in the SIF Study conducted in Year 2008 to 2010 - taking into account the aging plant and inherently non-robust plant design, and with lean maintenance organization with the unfavourable oil prices. Among focus areas is to be innovative in coming up the implementation strategy of the SIF Report Recommendation. Issues encountered by PPTSB being a brown field plant is the lack of cables spares to install additional initiators to meet the SIL 2 and SIL 3 required. The allocated CAPEX is also a challenge to implement the 2oo3 initiators/transmitters configuration to meet the SIL 3. Toward this end, PP(T)SB has embarked on using the unorthodox 1oo2 voting with 1 hour Automatic Sensor Override (ASO) for its transmitters, instead of the conventional 2oo3 voting for about 80 nos of safeguarding tags in compliance with the IEC standard. The project was completed in 2011 and 2012 for PC aromatics and Refinery respectively. As part of the continuous improvement, the 1oo2 with ASO logic was further modified in 2012 to ensure all failure modes of the transmitters are captured and sent to DCS for Operators further action. In 2014, we have identified 27 tags with 1oo2 with ASO configuration which have control or indicating transmitters to be further upgraded to 2oo3 voting. The cost of conversion is very minimum since we are utilizing the indicating or the control transmitters as the 3rd safeguarding transmitters to form a 2oo3 voting. For the shutdown Valves, the strategy is to have procedure and philosophy in place to ensure good maintenance of the shutdown valves which begins from completeness of shutdown valve database which serves as central repository for easy access and depository of critical information of all shutdown valves assets datasheet, photos, Bill of Materials, construction drawings etc. With the implementation of Systematic Shutdown Valves Philosophy, any potential dangerous failures of the shutdown valves are kept to the very minimum.
机译:位于西马来西亚东海岸的炼油厂PP(T)SB {PETRONAS Penapisan(Terengganu)Sdn Bhd}的工厂仪表的可靠性,尤其是安全仪表功能(SIF)至关重要。这里遇到的挑战是现有SIF仪器满足2008年至2010年进行的SIF研究中所计算和报告的安全完整性等级(SIL)的能力-考虑到老化的工厂和固有的非稳健工厂设计,以及不利的石油价格导致精益的维修组织。在重点领域中,将在提出SIF报告建议书的实施策略方面进行创新。 PPTSB属于棕地工厂时遇到的问题是,缺少电缆备用件来安装额外的引发剂以满足所需的SIL 2和SIL 3。分配的CAPEX也是实现2oo3发起方/发送方配置以满足SIL 3的挑战。为此,PP(T)SB已着手使用非传统的1oo2投票,并为其发送方使用1小时自动传感器覆盖(ASO) ,而不是传统的2oo3对符合IEC标准的约80个安全标签进行投票。该项目分别于2011年和2012年完成,分别用于PC芳烃和炼油厂。作为持续改进的一部分,2012年对带有ASO逻辑的1oo2进行了进一步修改,以确保捕获变送器的所有故障模式并将其发送给DCS,以供操作员采取进一步措施。 2014年,我们确定了27个带有Aoo配置的1oo2的标签,这些标签具有控制或指示发送器的功能,并将进一步升级为2oo3投票。转换成本非常低,因为我们将指示或控制发送器用作第三安全发送器以形成2oo3投票。对于截止阀,策略是要有适当的程序和理念以确保对截止阀的良好维护,这要从截止阀数据库的完整性开始,该数据库用作中央存储库,可轻松访问和存储所有截止阀资产的关键信息,照片,物料清单,结构图等。随着系统关闭阀理念的实施,关闭阀的任何潜在危险故障都可保持在最低限度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号