首页> 外文会议>Engineers' Society of Western Pennsylvania;Annual International Bridge Conference >Burgoyne Bridge Designed to Respect History of Site and to Create a New Landmark
【24h】

Burgoyne Bridge Designed to Respect History of Site and to Create a New Landmark

机译:Burgoyne桥旨在尊重现场历史并创建新地标

获取原文

摘要

The Region of Niagara is in the process of replacing the nearly 100-year-old BurgoyneBridge in the City of St. Catharines, Ontario, Canada. Two key factors were the desire to create aniconic or landmark bridge, and the necessity of maintaining traffic throughout construction. Thepaper discusses technical considerations including corridor selection, alignment, staging, detailedgeometry, the integration of bridge construction and bridge demolition, the consideration ofadjacent properties and businesses, and connections to local roadways. The development of thenew bridge concept and preliminary design are also explored, including reference to inspirationalprojects elsewhere, and to the history of heritage bridges at the site. Finally the resulting 330mlong twin structural steel box girder viaduct bridge, including a single 125m structural steel archspan, is put into context from technical, environmental, and stakeholder perspectives.
机译:尼亚加拉大区正在替换拥有近100年历史的Burgoyne 桥梁在市圣凯瑟琳斯,安大略,加拿大。两个关键因素是创建一个 标志性或地标性桥梁,以及在整个施工过程中保持交通顺畅的必要性。这 论文讨论了技术考虑因素,包括走廊选择,对齐,分段,详细 几何形状,桥梁施工与桥梁拆除的整合,考虑 邻近的物业和企业,以及与本地道路的连接。的发展 还探索了新的桥梁概念和初步设计,包括对鼓舞人心的参考 项目在其他地方,以及该站点的遗产桥梁的历史。最终产生的330m 长双胞胎结构钢箱梁高架桥,包括一个125m的单结构钢拱 从技术,环境和利益相关方的角度将范围跨入上下文。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号