首页> 外文会议>European conference on soil mechanics and geotechnical >Training and education in ground investigation - can we make quality count?
【24h】

Training and education in ground investigation - can we make quality count?

机译:地面调查方面的培训和教育-我们可以进行质量计数吗?

获取原文

摘要

Eurocodes were implemented by the UK with effect from April 2010. Theoretically since that date the geotechnical community should have been undertaking the design of ground investigations and derivation of parameters for design, in accordance with EC7. Analysis of a large number of ground investigations undertaken since 2010, reveals that this is not the case and that in fact the majority of geotechnical work being undertaken (at least in terms of project numbers) makes little or no reference to the EC7 suite of standards. This disappointing fact is set against the backdrop of a concerted effort by a number of industry practitioners to both promote the use of the new standards and to assist in educating the wider geotechnical community on how the standards should be used. The author contends that this situation is being driven by a lack of enthusiasm by what is becoming an aged geotechnical community in the UK. Many of those with the authority to procure ground investigation services, have been in the industry for at least 20 years and are 'comfortable' with the manner in which ground investigation has always been designed and undertaken. This familiarity with certain investigation techniques does not sit well with the requirements of EC7, which requires designers to put quality issues at the forefront of the decision making process. Is it time that we started empowering current and recent graduates in geotechnics to embrace the ethos of EC7, such that future ground investigations provide employers with quality data that is of real value?
机译:欧洲峰由英国实施,从2010年4月起实现了效果。从那时起,岩土公共社区应该是根据EC7进行地面调查的设计和参数的推导,根据EC7。自2010年以来进行的大量地面调查分析揭示了这一点并非如此,实际上正在大多数岩土工程(至少在项目编号方面)对EC7标准套件进行了很少或没有提及。这一事实令人失望的事实是通过许多行业从业者来促进新标准的协调努力的背景下,并协助教育更广泛的岩土公路社区对应如何使用标准。作者认为,这种情况是由于英国老年岩土公路社区而缺乏热情的推动。许多有权获得地面调查服务的人,在行业中至少有20年,并“舒适”,始终设计了地面调查的方式。这种对某些调查技术的熟悉程度不适用于EC7的要求,这需要设计人员在决策过程的最前沿提出质量问题。是时候我们开始赋予岩土电机的当前和最近毕业生,以接受EC7的精神,使未来的地面调查为雇主提供具有实际价值的质量数据?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号