Change effort estimation based on UML diagrams application in UCP and COCOMOII

机译:基于UML图的变更工作量估计在UCP和COCOMOII中的应用

获取原文

摘要

Change impact must be accounted for during effort estimation to provide for adequate decision making at the appropriate moment in the software lifecycle. Existing effort estimation approaches, like the Use Case Point method and the Constructive COst MOdeL, estimate the effort only if the change occurs at one level, for example when a new functionality is added (at functional level). However, they do not treat elementary changes at the design level such as the addition of a class or a sequence diagram; because they incur several modifications at different modelling levels, such changes are important to account for in effort estimation during the software development. In this paper, we take advantage of intra and inter UML diagrams dependencies, first, to assist developers in identifying the necessary changes that UML diagrams must undergo after a potential change, and secondly to estimate the necessary effort to handle any elementary change e.g. adding a class, an attribute, etc. We use our traceability technique in order to adapt the UCP and COCOMO methods to estimate the effort whenever a change occurs during the requirement or design phases.
机译:在工作量估算期间必须考虑变更影响,以在软件生命周期的适当时刻提供适当的决策。现有的工作量估算方法(例如用例点方法和构造成本模型)仅在更改发生在一个级别上(例如,当添加新功能时(在功能级别))才估算工作量。但是,它们不处理设计级别的基本更改,例如添加类或序列图;因为它们会在不同的建模级别上进行若干修改,所以这种变化对于在软件开发过程中进行工作量估算很重要。在本文中,我们利用UML内部和内部UML关系图的优势,首先是帮助开发人员确定潜在更改后UML图必须进行的必要更改,其次是估计处理任何基本更改(例如,添加类,属性等。我们使用可追溯性技术来调整UCP和COCOMO方法,以在需求或设计阶段中发生更改时估算工作量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号