Financial Measuring of Incremental Deliveries in Software Projects -- Finding a Model That Can Answer: How Much is Worth to Split a Project into Iterations?

机译:软件项目中增量交付的财务度量-找到一个可以回答的模型:将项目分成多个迭代有多少价值?

获取原文

摘要

In this article, it is presented a mathematical model for the additional financial value generated in software projects, as a function of the number of incremental deliveries during the project. Based on this model, it was presented the theoretical asymptotic limit, for infinite deliveries during the project. This practice is called Continuous Deployment (CD), already used by many companies such as Google and Facebook. As financial evaluation measuring, it was used the Net Present Value (NPV). It was also measured how the use of incremental deliveries can create additional NPV for software projects which have short duration (maximum of six months), median duration (one year) and long duration (two years). At the end, it is argued that this additional value can be strategic for maintaining a sustainable portfolio of innovation projects.
机译:在本文中,提出了一个数学模型,用于计算软件项目中产生的附加财务价值,该数学模型是项目期间增量交付数量的函数。基于此模型,提出了项目期间无限交付的理论渐近极限。这种做法称为连续部署(CD),已经被许多公司(例如Google和Facebook)使用。作为财务评估度量,使用了净现值(NPV)。还测量了增量交付的使用如何为期限短(最长六个月),期限中位数(一年)和期限长(两年)的软件项目创建额外的净现值。最后,有人争辩说,这种额外的价值对于保持创新项目的可持续组合可能具有战略意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号