Megaprojects: Insights for Not Losing Billions of Dollars

机译:大型项目:不损失数十亿美元的见解

获取原文

摘要

A Capital Project has, by its intrinsic nature, a complex environment where plenty ofdeliverables and expectations ought to be achieved. However, data has been shown thatCapital Projects, especially Mega Capital Projects, defined here with CapEx bigger than US$ 500million, fail so often. Governments and entrepreneurs crave to know which are the keystrategies to deliver a successful Megaproject. Despite the fact that, most probably, there is noultimate answer to this intriguing question, a wide range of tools and techniques have beendeveloped throughout the years, for instance the established FEL methodology. This paperexplores a case study showing that a disciplined and effortful conduction of a project is asimportant as its planning phase. Therefore, an attempt to correlate Maturity Index (maturity ofa project at goo go gate) and Disciplined Execution with CapEx deviation is performed. Finally,it is presented an example showing how disastrous and value destroyer a mal-planned andexecuted project can be.
机译:一项基本建设项目就其固有性质而言,是一个复杂的环境,其中有大量的 可交付成果和期望应该实现。但是,数据显示 此处定义的资本支出(CapEx)大于500美元的资本项目(尤其是Mega Capital Projects) 百万,经常失败。政府和企业家渴望知道哪些是关键 成功实施Megaproject的策略。尽管事实上,很可能没有 对于这个有趣的问题的最终答案,各种各样的工具和技术已经被使用。 经过多年的发展,例如已建立的FEL方法。这篇报告 探索了一个案例研究,该研究表明,有条不紊地进行项目是 重要的是它的计划阶段。因此,尝试将成熟度指数( 一个项目,然后执行有CapEx偏差的纪律执行。最后, 它提供了一个示例,显示了灾难性和价值破坏者如何计划不当, 执行项目即可。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号