Effectiveness of Line Surge Arrester Application on the 132kV Kuala Krai – Gua Musang Line

机译:线电压避雷器在132kV瓜莱边疆区-瓜木桑线的应用效果

获取原文

摘要

The Transmission Division of Tenaga National Berhad (TNB), Malaysia manages andoperates the 132kV, 275kV and 500kV transmission systems that form an integrated networkknown as the National Grid. TNB’s National Grid system spans the whole of PeninsularMalaysia that represents the backbone of the electricity industry and the TransmissionDivision is responsible for the safe, adequate, reliable and economical operation of the gridsystem in conformance to the Malaysian Grid Code.Malaysia being in one of the highest region of lightning is experiencing a tremendously highnumber of lightning strikes every year, thus giving a very high Ground Flash Density (GFD)value. This high GFD value has very much affected the performance of the Distribution andTransmission lines owned by TNB. The line with the highest recorded lightning tripping inPeninsula Malaysia is the 132kV Kuala Krai (KKRI) to Gua Musang (GMSG) line which islocated in the North-East of Peninsular Malaysia.The 113km 132kV KKRI-GMSG line consist of 295 towers, commissioned in 1995 with adouble circuit line configuration. The line has recorded a tremendous number of 55 trippings;11 are single circuit trippings and 22 are double circuit trippings. The calculated actual triprate for 12 years (2001 - 2013) is 4.58 trip/km.year. The rate is considered as unacceptablyhigh comparing to the average trip rate recorded for TNB’s 132kV lines, which is 1.8trip/100km.yr. Elsewhere in other utilities, the acceptable trip rate for 132kV lines aregenerally 1.5 to 2.8 trip/100km.yr.A lightning performance study was conducted to evaluate the line lightning performance andto explain the ‘un-effectiveness’ of the installed Transmission Line Arrester (TLA) on the linesince 2007. The line was installed with more than 120 units of TLA since 2007 until 2012.TFlash software by EPRI USA and SIGMA SLP by Sadovic France was used in the study. Aninteresting outcome from the simulation result is presented in this study.
机译:马来西亚Tenaga National Berhad(TNB)的传动部门负责管理和 运行132kV,275kV和500kV输电系统,形成一个综合网络 被称为国家电网。 TNB的国家网格系统横跨整个半岛 马来西亚代表了电力工业和输电的中坚力量 该部门负责电网的安全,充分,可靠和经济的运行 符合马来西亚电网法规的系统。 马来西亚处在雷电最高地区之一 每年的雷击次数,因此具有很高的地面闪光密度(GFD) 价值。高GFD值极大地影响了分布和 TNB拥有的传输线。记录到的最高雷击跳闸的线路 马来西亚半岛是132kV瓜拉边(KKRI)至Gua Musang(GMSG)线路, 位于马来西亚半岛东北部。 113公里的132kV KKRI-GMSG线路由295座塔架组成,于1995年投入使用, 双回路线配置。该线路记录了55次跳闸; 11是单回路跳闸,22是双回路跳闸。计算出的实际行程 12年(2001年-2013年)的费率为4.58行程/公里。年。该比率被认为是不可接受的 与TNB的132kV线路记录的平均跳闸率1.8相比要高 行程100公里在其他公用事业中,132kV线路的可接受跳闸速率为 一般每百公里1.5到2.8行程。 进行了防雷性能研究,以评估线路的防雷性能和 解释线路上已安装的传输线避雷器(TLA)的“无效” 自2007年以来。自2007年至2012年,该生产线共安装了120多台TLA。 该研究使用了EPRI USA的TFlash软件和Sadovic France的SIGMA SLP。一个 这项研究提出了有趣的模拟结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号