首页> 外文会议>CIGRE Session >Effectiveness of Line Surge Arrester Application on the 132kV Kuala Krai - Gua Musang Line
【24h】

Effectiveness of Line Surge Arrester Application on the 132kV Kuala Krai - Gua Musang Line

机译:线浪避雷器应用在132kV吉隆克里 - 桂缪局的有效性

获取原文

摘要

The Transmission Division of Tenaga National Berhad (TNB), Malaysia manages and operates the 132kV, 275kV and 500kV transmission systems that form an integrated network known as the National Grid. TNB's National Grid system spans the whole of Peninsular Malaysia that represents the backbone of the electricity industry and the Transmission Division is responsible for the safe, adequate, reliable and economical operation of the grid system in conformance to the Malaysian Grid Code. Malaysia being in one of the highest region of lightning is experiencing a tremendously high number of lightning strikes every year, thus giving a very high Ground Flash Density (GFD) value. This high GFD value has very much affected the performance of the Distribution and Transmission lines owned by TNB. The line with the highest recorded lightning tripping in Peninsula Malaysia is the 132kV Kuala Krai (KKRI) to Gua Musang (GMSG) line which is located in the North-East of Peninsular Malaysia. The 113km 132kV KKRI-GMSG line consist of 295 towers, commissioned in 1995 with a double circuit line configuration. The line has recorded a tremendous number of 55 trippings; 11 are single circuit trippings and 22 are double circuit trippings. The calculated actual trip rate for 12 years (2001 - 2013) is 4.58 trip/km.year. The rate is considered as unacceptably high comparing to the average trip rate recorded for TNB's 132kV lines, which is 1.8 trip/100km.yr. Elsewhere in other utilities, the acceptable trip rate for 132kV lines are generally 1.5 to 2.8 trip/100km.yr. A lightning performance study was conducted to evaluate the line lightning performance and to explain the 'un-effectiveness' of the installed Transmission Line Arrester (TLA) on the line since 2007. The line was installed with more than 120 units of TLA since 2007 until 2012. TFlash software by EPRI USA and SIGMA SLP by Sadovic France was used in the study. An interesting outcome from the simulation result is presented in this study.
机译:国家能源国家Berhad公司的传动部(TNB),马来西亚管理经营该形成称为国家电网集成网络132千伏,275kV和500kV输电系统。 TNB的国家电网系统跨越整个半岛马来西亚,代表电力行业的骨干,传输部门负责网格系统的安全,充分,可靠,经济的运行,符合马来西亚网格代码。马来西亚在闪电的最高区域之一是每年都在经历着一个非常高的数字闪电罢工,从而给人一种很制高点闪存的密度(GFD)值。这种高GFD价值已经非常受TNB所拥有的分布和传输线的性能。最高记录闪电马来西亚半岛跳闸的线路是132千伏吉隆坡边疆区(KKRI)到话望生(GMSG)线位于马来西亚半岛的东北部。所述113公里132千伏KKRI-GMSG线包括塔295,在1995年委托用双电路线路的配置。行记录了55个trippings巨大数目;图11是单回路trippings和22是双电路trippings。 12年(2001年至2013年)计算出的实际出行率是4.58跳闸/ km.year。率被认为是不可接受的比较记录TNB的132千伏线路,这是一趟1.8 / 100km.yr平均出行速度。别处在其他实用程序,为132千伏线可接受的行程速度通常为1.5〜2.8跳闸/ 100km.yr。闪电的性能进行研究,以评估该线路的防雷性能和讲解安装输电线路避雷器(TLA)的就行了“联合国效益”自2007年以来该生产线安装了120余台自2007年TLA,直到通过EPRI美国和SIGMA SLP通过Sadovic法国2012年TFLASH软件在研究中使用。从仿真结果的一个有趣的结果,提出了这项研究。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号