首页> 外文会议>Chinese Control and Decision Conference >Modeling for project scheduling with multi-skilled workforce constraints and uncertainty
【24h】

Modeling for project scheduling with multi-skilled workforce constraints and uncertainty

机译:具有多技能劳动力约束和不确定性的项目进度建模

获取原文
获取外文期刊封面目录资料

摘要

This paper presents a new workforce allocation optimization model for project scheduling problems with multi-skilled workforce constraints (PSPMSWC), under uncertainty about the projects. The model is a mixed-integer program(MIP) model that aims at maximizing the total profit. As a subproblem, scheduling and staff assignment for projects must also be optimized. In the experiment, projects are selected randomly, and we get the workforce allocation optimal solution as well as workforce assigned optimal strategy by means of CPLEX.
机译:本文提出了一种新的劳动力分配优化模型,该模型用于在项目不确定的情况下具有多技能劳动力约束的项目调度问题(PSPMSWC)。该模型是旨在使总利润最大化的混合整数程序(MIP)模型。作为一个子问题,还必须优化项目的调度和人员分配。在实验中,项目是随机选择的,我们通过CPLEX得到了劳动力分配的最佳解决方案以及劳动力分配的最优策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号