首页> 外文会议>Mediterranean Conference on Control and Automation >Distance protection relays installation prioritization in distribution networks using analytic hierarchy process and cost-benefit analysis
【24h】

Distance protection relays installation prioritization in distribution networks using analytic hierarchy process and cost-benefit analysis

机译:使用分析层次处理和成本效益分析,远程保护继电器在配送网络中的安装优先级

获取原文
获取外文期刊封面目录资料

摘要

Due to the increasing low capacity distributed generators (DGs) installations and penalization of supply disruptions in electrical distribution grid, it is necessary to invest in the distribution protection system. This paper discusses profitability of installation of relays with distance protection function that could protect lines of different voltage levels, lengths and other relevant attributes. The aim is to determine which lines are worth protecting with distance protection and according to that, order of investment by multi-criteria decisionmaking method - analytic hierarchic process (AHP). The first part is an introduction where the circumstances, potential benefits and problems that may arise in distribution grids are presented. This is followed by theory of distance protection and analytic hierarchy process. The final part describes the criteria that should be considered and the way of applying the AHP method with a real example from Croatian distribution grid.
机译:由于低容量分布式发电机(DGS)安装和电气分配电网供电中断的惩罚,有必要投资分配保护系统。本文讨论了带距离保护功能的继电器安装的盈利能力,可以保护不同电压电平,长度和其他相关属性的线条。目的是确定哪些线条值得用距离保护保护,并根据该行,通过多标准作出决策方法进行投资的顺序 - 分析层次过程(AHP)。第一部分是介绍在发布网格中可能出现的情况,潜在的益处和问题。其次是距离保护和分析层次处理的理论。最后部分描述了应考虑的标准以及将AHP方法应用于来自克罗地亚分布网格的实例的方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号