首页> 外文会议>International Scientific Conference on Electric Power Engineering >Determination of critical factors for optimal positioning of Phase-Shift Transformers in interconnected systems
【24h】

Determination of critical factors for optimal positioning of Phase-Shift Transformers in interconnected systems

机译:相互连接系统中相移变压器最优定位关键因素的确定

获取原文

摘要

Phase-Shifting Transformers (PST) are installed in order to block or facilitate certain power flows. The installation of a single device affects power flows in a wider geographical area. Therefore, determining the optimal location for the Phase Shift transformer is of the utmost importance. Firstly, this paper presents summarizes the key factors for the installation of Phase Shift Transformers. Secondly, it give the prerequisites for the installation and finally, and thirdly it determines the deduced critical factors which have to be analyzed from the local (substation level), and global (system-wise) perspective. Given the necessity for regional approach when determining optimal PST location, this paper focuses on selected results of possibilities for active power flow control using PSTs in the South Eastern Europe (SEE) transmission grid. At the end, in the form a a power flow anaylsis, such an example is presented.
机译:安装移相变压器(PST)以阻止或促进某些功率流动。单个设备的安装会影响更广泛的地理区域中的功率流。因此,确定相移变换器的最佳位置是最重要的。首先,本文介绍了安装相移变压器的关键因素。其次,它给出了安装的先决条件,最后,第三,它决定了所推断的关键因素,这些因素必须从本地(变电站)和全球(系统 - 明智)的角度分析。鉴于区域方法的必要性确定最佳PST位置时,本文侧重于在东南欧(参见)传输网格中的PST的主动电流控制的选定能力结果。最后,在形式中,呈现这样的示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号