首页> 外文会议>COTA international conference of transportation professionals >Modeling and Analysis Method of Network Nodes for Pedestrian Facility Layout Scheme Selection in Urban Rail Transit Station
【24h】

Modeling and Analysis Method of Network Nodes for Pedestrian Facility Layout Scheme Selection in Urban Rail Transit Station

机译:城市轨道交通车站行人设施布局方案选择的网络节点建模与分析方法

获取原文

摘要

To help select pedestrian facility layout scheme during design phase in urban rail transit station, a modeling and analysis method was proposed, which adopted four stages prediction method to complete traffic assignment for bottleneck identification and calculate travel time through pedestrian route network building. Three types of delay nodes (D nodes) were defined and used for calculating delay, and an analysis model was especially set up for D nodes caused by congestion. The method is implemented in an example application in VISUM.
机译:为了在城市轨道交通车站的设计阶段帮助选择行人设施布局方案,提出了一种建模与分析方法,该方法采用四阶段预测方法完成交通分配以识别瓶颈,并通过行人路网建设计算出行时间。定义了三种类型的延迟节点(D节点)并将其用于计算延迟,并且特别针对由拥塞引起的D节点建立了分析模型。该方法在VISUM中的示例应用程序中实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号