首页> 外文会议>International conference on railway engineering design and operation >Taking effective delay reduction measures and using delay elements as indices for Tokyo's metropolitan railways
【24h】

Taking effective delay reduction measures and using delay elements as indices for Tokyo's metropolitan railways

机译:采取有效的延误减少措施并将延误元素用作东京都会铁路的指标

获取原文

摘要

In the Tokyo metropolitan area of Japan, several minutes of delays often happen during morning rush hour. This is because a massive number of passengers use trains for commuting. Then trains and platforms are congested. Above all, once a train delays due to increasing dwell time, the subsequent train has to wait outside a station or slow down if the platform is occupied by the preceding train. This process is repeated over and over again and delays increase more and more. So we had to identify how often or how large delays occur and take delay reduction measures, because it is pointless to blindly carry out delay reduction measures. The measures should be carried out effectively; otherwise investigations and running costs become high. In this paper, we introduce delay reduction measures and indices, which indicate the frequency of delays and the scale of delays.
机译:在日本东京都会区,高峰时间通常会延迟几分钟。这是因为大量的乘客使用火车上下班。然后火车和月台拥挤。最重要的是,一旦一列火车由于增加的停留时间而延迟,则下一列火车必须在站外等待,或者如果平台被前一列火车占用,则必须放慢速度。这个过程一遍又一遍地重复,并且延迟越来越多。因此,我们必须确定延迟发生的频率或程度,并采取减少延迟的措施,因为盲目地执行减少延迟的措施是没有意义的。措施应有效执行;否则调查和运行成本会很高。在本文中,我们介绍了延迟减少措施和指标,它们指示了延迟的频率和延迟的规模。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号