首页> 外文会议>Petroleum and Chemical Industry Conference Europe Electrical and Instrumentation Applications >Electrical system management in preparation and during decommissioning. offshore installations
【24h】

Electrical system management in preparation and during decommissioning. offshore installations

机译:电气系统管理准备和退役期间。海上设施

获取原文

摘要

According to industry body Oil and Gas UK, [1] there are some 475 installations, 10,000 kilometres of pipelines, 15 onshore terminals and 5,000 wells that will eventually be decommissioned in the UK Oil and Gas industry. This paper summarises the various aspects when a platform is being prepared for decommissioning. These sometimes may become contradicting to each other. For example, on a maintenance front, power generation / electrical system availability and reliability figures need improvement to support wells plug and abandonment, while most downstream electrical distribution components can get those figures lowered. Moving away from hydrocarbon production creates an opportunity to revisit the classification of hazardous areas. Special attention is required for management of electrical safety competences, due to gap creation with experienced personnel moving on. This is paramount when methods of isolations are developed for redundant equipment. This paper is intended to aid both design and maintenance electrical engineers in supporting assets that are being prepared for decommissioning.
机译:根据行业石油和天然气英国,[1]有一些475个安装,10,000公里的管道,15座陆路,5000井,最终将在英国石油和天然气行业退役。本文总结了平台正在进行退役时的各个方面。这些有时可能会彼此相互作用。例如,在维护前沿,发电​​/电气系统可用性和可靠性数据需要改进,以支持井即插块和放弃,而大多数下游电气分配组件可以获得那些降低的那些数字。远离碳氢化合物生产会产生重新审视危险区域分类的机会。由于经验丰富的人员继续前进,因此需要特别注意电气安全能力。当为冗余设备开发隔离方法时,这是至关重要的。本文旨在帮助设计和维护电气工程师在支持退役的资产中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号