首页> 外文会议>Petroleum and Chemical Industry Conference Europe Electrical and Instrumentation Applications >Electrical system management in preparation and during decommissioning. offshore installations
【24h】

Electrical system management in preparation and during decommissioning. offshore installations

机译:在准备工作和退役期间进行电气系统管理。离岸安装

获取原文

摘要

According to industry body Oil and Gas UK, [1] there are some 475 installations, 10,000 kilometres of pipelines, 15 onshore terminals and 5,000 wells that will eventually be decommissioned in the UK Oil and Gas industry. This paper summarises the various aspects when a platform is being prepared for decommissioning. These sometimes may become contradicting to each other. For example, on a maintenance front, power generation / electrical system availability and reliability figures need improvement to support wells plug and abandonment, while most downstream electrical distribution components can get those figures lowered. Moving away from hydrocarbon production creates an opportunity to revisit the classification of hazardous areas. Special attention is required for management of electrical safety competences, due to gap creation with experienced personnel moving on. This is paramount when methods of isolations are developed for redundant equipment. This paper is intended to aid both design and maintenance electrical engineers in supporting assets that are being prepared for decommissioning.
机译:根据英国石油和天然气行业机构的说法,[1]大约有475项安装,10,000公里的管道,15个陆上码头和5,000口井最终将在英国的石油和天然气行业中退役。本文总结了准备退役平台时的各个方面。这些有时可能彼此矛盾。例如,在维护方面,需要改善发电/电气系统的可用性和可靠性指标,以支持井的插拔作业,而大多数下游配电组件可以降低这些指标。放弃碳氢化合物生产创造了一个机会,可以重新审视危险区域的分类。由于有经验的人员在不断前进,会产生差距,因此需要特别注意电气安全能力的管理。当为冗余设备开发隔离方法时,这是至关重要的。本文旨在帮助设计和维护电气工程师支持准备退役的资产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号