ENHANCING PIPELINE RESEARCH PROJECT MANAGEMENT WITH POST- ASSESSMENT

机译:通过事后评估增强管道研究项目管理

获取原文

摘要

Post-assessment of pipeline research project assesses the project implementation process and the subsequent effect of the project application. The former assesses the realization of the research goals, the quality of the project implementation, the conformity to the research plan, and the ability of the project manager, while the latter attaches more importance on the long-term application and achievement of the technology developed by the research project after it has been accepted by the administrative department for one year or more. Post-assessment of pipeline research project provides a reference for scientific and technological administrative department in decision-making to improve project quality and investment efficiency of research activities, upgrade the management level. PetroChina Pipeline Company (PPC) used two years to set up the index system, choose the weight factors and build the assessment modeling of the post-assessment method. After that, a large number of research projects had been assessed by project managers and management staff to test the post-assessment method in order to modify the assessment software. This paper will: 1. Demonstrate the characteristics of the post-assessment of pipeline research project 2. Describe the scope and content of the post-assessment 3. Illustrate the process of the post-assessment 4. Identify required index system and calculation modeling 5. Discuss advantages of post-assessment in enhancing pipeline research project management.
机译:管道研究项目的后评估将评估项目实施过程以及项目应用的后续效果。前者评估研究目标的实现,项目实施的质量,研究计划的符合性以及项目经理的能力,而后者则更重视长期应用和所开发技术的成就在行政部门接受一年或一年以上的研究项目后,再进行此项研究。管道研究项目的后评估为科学技术管理部门的决策提供参考,以提高项目质量和研究活动的投资效率,提升管理水平。中石油管道公司(PPC)用了两年的时间建立指标体系,选择权重因子,建立后评价方法的评估模型。之后,项目经理和管理人员对大量研究项目进行了评估,以测试后评估方法,以修改评估软件。本文将:1.展示管道研究项目的后评估的特征2.描述后评估的范围和内容3.说明后评估的过程4.确定所需的指标体系和计算模型5讨论后期评估在加强管道研究项目管理方面的优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号