首页> 外文会议>International conference on urban regeneration and sustainability >The legacy and prospects of the Gauteng City-Region's mining landscapes
【24h】

The legacy and prospects of the Gauteng City-Region's mining landscapes

机译:豪登市地区采矿景观的遗产和前景

获取原文

摘要

Mine Residue Areas (MRAs) describe general mine waste associated mainly with gold-mining. In a recent study compiled by the Gauteng Department of Agricultural and Rural Development (GDARD), 374 Mine Residue Areas were identified in the Gauteng City-Region (GCR) of South Africa (SA). Of these, only 25km~2 of the total 321km~2 covered by MRAs can be rehabilitated at a low cost. Insufficient mine closure plans have created a mining landscape legacy that is scattered across the GCR, serving as a constant reminder of how concepts of sustainability were not part of past mining responsibilities and still appear to slip through the cracks of SA's environmental and mining legislation. MRAs affect air and water quality, present geo-technical safety concerns for communities and create physical barriers to the movement of people, presenting challenges for spatial redevelopment and integration programmes. It is predicted that these challenges will only be exacerbated as a result of climate change, which predicts increased variability in weather extremes. This paper provides an overview government mining policy around MRAs and the environment and evaluates how these policies align with strategies to mitigate and adapt to climate change to create a more sustainable region. This paper identifies potential risks of exposing MRAs to changing climatic variables, informing the management of MRAs within the GCR. These findings will assist with clarifying appropriate mitigation and adaption strategies to ensure infrastructure and communities, infrastructure and the environment are not further affected.
机译:矿山残渣区(MRA)描述了主要与金矿有关的一般矿山废物。在豪登省农业和农村发展部(GDARD)编制的最新研究中,在南非(SA)的豪登市地区(GCR)中确定了374个矿山残存区。其中,MRA覆盖的全部321km〜2中只有25km〜2可以低成本修复。矿山关闭计划不足,造成了整个GCR分散的采矿业遗产遗迹,不断提醒人们可持续发展的概念已不再是过去采矿职责的一部分,而且似乎仍然会渗入SA的环境和采矿法规的缝隙中。 MRA影响空气和水的质量,给社区带来岩土工程安全问题,并为人员流动创造物理障碍,对空间重建和整合计划提出挑战。据预测,这些挑战只会由于气候变化而加剧,这预示着极端天气的可变性会增加。本文概述了有关MRA和环境的政府采矿政策,并评估了这些政策如何与缓解和适应气候变化的战略保持一致,以创建一个更具可持续性的地区。本文确定了将MRA暴露于变化的气候变量中的潜在风险,从而为GCR内的MRA管理提供了信息。这些发现将有助于阐明适当的缓解和适应策略,以确保基础设施和社区,基础设施和环境不再受到影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号