首页> 外文会议>Iberian Conference on Information Systems and Technologies >Max-Min Ant System to solve the software project scheduling problem
【24h】

Max-Min Ant System to solve the software project scheduling problem

机译:Max-Min Ant System解决软件项目调度问题

获取原文

摘要

The Software Project Scheduling Problem is a special case of project scheduling problems. This problem consists in assigning workers with different skills, to a series of tasks in a software project so that the project is completed in the shortest time and the lowest cost possible. In addition, this allocation must meet the constraints of skill required for each task and the precedence constraints between tasks. The solution to this problem is presented using the Max — Min Ant System algorithm and the Hypercube framework. Two heuristics capable of guiding the algorithm to find better solutions are proposed. Experimental results are presented and compared with other techniques of resolution, showing an improvement by implementing our proposal.
机译:软件项目计划问题是项目计划问题的特例。这个问题在于,将具有不同技能的工人分配给软件项目中的一系列任务,以使项目在最短的时间内完成并以最低的成本完成。此外,此分配必须满足每个任务所需的技能约束以及任务之间的优先约束。使用最大—最小蚂蚁系统算法和Hypercube框架提出了该问题的解决方案。提出了两种能够指导算法找到更好解决方案的启发式方法。提出了实验结果,并将其与其他解析技术进行了比较,显示了通过实施我们的建议而得到的改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号