Connection of 8 MW CHP to belgrade distribution grid

机译:将8 MW CHP连接到贝尔格莱德分发网格

获取原文

摘要

A connection of perspective 8 MW power plant Umka to 10 kV power distribution grid in Belgrade is presented in the paper. The connection is specific about two aspects: 8 MW is high power to be evacuated over 10 kV grid and power plant will be connected to 10 kV directly, without step-up transformer. Short circuits and load flow system analyses are carried out by using the computer simulation models of distribution system critical operation regimes in order to investigate connection criteria defined by distribution system grid code. Another contribution of power plant Umka should be strengthening of 10 kV distribution grid and elimination of voltage dips problems that have occurred for years in a factory Umka.
机译:纸张中提出了透视8 MW电厂UMKA至10 kV配电电网的连接。该连接特定于两个方面:8兆瓦是高功率,以超过10千伏电网,电厂将直接连接到10kV,无需升压变压器。通过使用分布系统关键操作制度的计算机仿真模型来执行短路和负载流量系统分析,以调查由分销系统网格代码定义的连接标准。电厂UMKA的另一个贡献应该加强10 kV分布网格,并消除在工厂umka中多年来发生的电压下降问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号