首页> 外文期刊>Platts Megawatt Daily >Eastern US grid connection queues for 2020 have 19,013 MW of renewables, storage
【24h】

Eastern US grid connection queues for 2020 have 19,013 MW of renewables, storage

机译:2020年美国东部电网连接队列中将有19,013 MW可再生能源

获取原文
获取原文并翻译 | 示例
           

摘要

The US Northeastern ISO power markets have 19,013 MW of renewableenergy and energy storage resources expected to come online in 2020according to grid interconnection queue data, compared with a total of153,488 MW in the interconnection queues for all years.Multiple states served by wholesale power markets in PJMInterconnection, the New York Independent System Operator and ISONew England territory have mandated regulation and enactedlegislation to promote renewable energy as a way of reducinggreenhouse gas emissions.
机译:根据电网互联队列数据,美国东北部ISO电力市场有望在2020年实现19,013兆瓦的可再生能源和储能资源上线,而全年的互联队列中总共有153,488兆瓦。在PJM互联中,纽约独立系统运营商和ISO新英格兰地区已强制实施法规并制定了立法,以促进可再生能源的使用,以减少温室气体的排放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号